Building Interiors were asked to design a multi tenanted reception in Leeds City Centre. Our scheme was chosen above various design options as the design and budget met the brief.
홈페이지 포폴
Whilst onsite our Project Manager Craig, and site supervisor Jordon kept in close contact with the client every step of the way. As often happens throughout a scheme, changes were requested and implemented throughout the duration without impeding the programme.
00신우앤컴퍼니 회사소개서_최종
Mechanical and Electrical works, Supplied and fitted all storage and furniture, Solid and glass partitions and folding dividing walls, Ceilings and flooring, Decoration, and Refreshment area
00신우앤컴퍼니 회사소개서_최종
To be completed without interrupting the use of toilets for the office block.
00신우앤컴퍼니 회사소개서_최종
Amongst all standard trades this project included: Ceilings, M&E Works, partitioning, decorating, bespoke joinery and collaboration features.
00신우앤컴퍼니 회사소개서_최종
Building Interiors completed a full strip out of the existing building and installed the agreed Design & Build scheme to the high standard that HH Global required.
홈페이지 포폴
New Furniture ranged from stunning Vitra pieces to contemporary systems furniture.
00신우앤컴퍼니 회사소개서_최종
A lot of the details could not be determined until after the strip out phase and the features were uncovered. For this reason, the design process was ongoing on a week to week basis and heavily discussed and agreed with the client.
00신우앤컴퍼니 회사소개서_최종
Objective; To bring staff together. Design, Plan and Fit a new break-out and gaming area to create a vibrant communal space for employees across three buildings.
홈페이지 포폴
We retained and refurbed where necessary and installed new bespoke joinery & high back seating pods. Other works included new flooring, lighting & decoration.