Building Interiors were asked to design a multi tenanted reception in Leeds City Centre. Our scheme was chosen above various design options as the design and budget met the brief.
Whilst onsite our Project Manager Craig, and site supervisor Jordon kept in close contact with the client every step of the way. As often happens throughout a scheme, changes were requested and implemented throughout the duration without impeding the programme.
Mechanical and Electrical works, Supplied and fitted all storage and furniture, Solid and glass partitions and folding dividing walls, Ceilings and flooring, Decoration, and Refreshment area
Building Interiors completed a full strip out of the existing building and installed the agreed Design & Build scheme to the high standard that HH Global required.
A lot of the details could not be determined until after the strip out phase and the features were uncovered. For this reason, the design process was ongoing on a week to week basis and heavily discussed and agreed with the client.
Objective; To bring staff together. Design, Plan and Fit a new break-out and gaming area to create a vibrant communal space for employees across three buildings.
We retained and refurbed where necessary and installed new bespoke joinery & high back seating pods. Other works included new flooring, lighting & decoration.